Please note: You are using an outdated version of Internet Explorer. Please update to IE10 here to properly experience the ATI website.

58.

Slovenia – Ministry of Foreign Affairs

Very Poor

ATI_Donor Graph-58

OVERVIEW

Slovenia is not an IATI signatory but is covered by the Busan common standard commitments, of which IATI is a core component. Slovenia has produced a common standard implementation schedule, although this currently lacks an explicit plan for implementing IATI. Slovenia is participating in the EU-13 project for enhancing ODA reporting capacity and systems. A new website containing more information on projects funded by Slovenia is currently under development. Slovenia has not joined OGP.

 

 

ANALYSIS

Slovenia scores 10.8%, placing it in the very poor category. It ranks 40th out of 49 bilateral organisations. Its best performance is on organisation-level planning indicators. Although Slovenia publishes three year forward-looking budgets, these are published in PDF format which makes the information hard to access and compare with that of other donors. Slovenia performs poorly at the activity level, scoring zero on all but one sub-group of indicators – project documents. It scores for publishing tenders, but these are not assessed on a per activity basis. Of the 22 indicators that take format into account, none are published in machine-readable formats. Overall, Slovenia does not score on 31 of the 39 indicators.

RECOMMENDATIONS

  • Slovenia should join IATI and aim to begin publishing to the IATI standard in 2014.
  • It should update its common standard implementation schedule by early 2014, to include plans for full implementation of IATI by the end of 2015.
  • Slovenia should consider joining OGP which currently includes 17 EU Member States. This would be an opportunity to share best practice in open data and open government approaches with peers in the EU and with partners who receive Slovenian aid.

Close

DONOR PROFILE

First published to IATI:

N/A

Data was found in the following formats where relevant:

0% IATI

0% CSV/Excel

9% PDF

0% Website

91% Not Published

SCORING

10.80%

COMMITMENT TO
AID TRANSPARENCY:

3.33/10

PUBLICATION
ORGANISATION LEVEL:

6.39/25

PUBLICATION
ACTIVITY LEVEL:

1.09/65

Commitment

1. FOIA

2. Implementation Schedules

3. Accessibility

Publication Status
Source

http://www.rti-rating.org/country_data.php

Comments

Global RTI rating score of 130. Score conversion from total score on Global RTI rating to Index points done using the following scale: 1 - 60: 33 61- 90: 66 91 - 150: 100.

Click here for indicator definition
Click here to view history

1. FOIA

Stage

Status

Format

Source

Comments

Researcher
Document
http://www.rti-rating.org/country_data.php
Global RTI rating score of 130. Score conversion from total score on Global RTI rating to Index points done using the Expand...following scale: 1 - 60: 33 61- 90: 66 91 - 150: 100

Donor Review
Document
http://www.rti-rating.org/country_data.php

PWYF Review

Independent Reviewer
Disagree

PWYF Final Assessment
Document
http://www.rti-rating.org/country_data.php
Global RTI rating score of 130. Score conversion from total score on Global RTI rating to Index points done using the Expand...following scale: 1 - 60: 33 61- 90: 66 91 - 150: 100.

Donor Comments

Publication Status
Source

http://tracker.publishwhatyoufund.org/plan/organisations/

Comments

Based on total score received on Publish What You Fund's analysis of Common Standard/IATI implementation schedules. No updates appear to have been made before July 31st - the deadline for Index data collection.

Click here for indicator definition
Click here to view history

2. Implementation schedules

Stage

Status

Format

Source

Comments

Researcher
Document
http://tracker.publishwhatyoufund.org/plan/organisations/
Based on total score received on Publish What You Fund's analysis of Common Standard/IATI implementation schedules

Donor Review
Document
http://tracker.publishwhatyoufund.org/plan/organisations/
Comprehensive information on Slovenia's Country Programmable Aid (i.e. aid included in Outline Programmes - for the Outline Programmes 2013-15 see http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pd) Expand...will be available online by the end of 2013. Firstly in Slovene language http://www.mzz.gov.si/si/zunanja_politika_in_mednarodno_pravo/zunanja_politika/mednarodno_razvojno_sodelovanje_in_humanitarna_pomoc/utrinki_s_terena/ and afterwards in Slovenian and English. The information will entail at least the following data: Recipient country, Project name, Short description, Channel of delivery name, Channel code, Type of aid, Purpose code, Extending agency, Donor project N°, Commitment date, Start – End, Commitments in EUR and Amounts extended in EUR. The implementation schedule will be corrected accordingly.

PWYF Review
Implementation schedules published before July 31st will be accepted.

Independent Reviewer
Disagree
Implementation schedules published before July 31st will be accepted.

PWYF Final Assessment
Document
http://tracker.publishwhatyoufund.org/plan/organisations/
Based on total score received on Publish What You Fund's analysis of Common Standard/IATI implementation schedules. No updates appear to have Expand...been made before July 31st - the deadline for Index data collection.

Donor Comments

Publication Status
Source

No data available.

Comments

No project database or data portal found.

Click here for indicator definition
Click here to view history

3. Accessibility

Stage

Status

Format

Source

Comments

Researcher
Document
N/A
No project database or data portal found.

Donor Review
Document
N/A
Information on the bulk of Slovenia's Country Programmable Aid is already available in pdf by the main implementer of Slovenia's ODA Expand...- the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.

PWYF Review
N/A
This is not the same as a project database or dataportal or a searchable data source.

Independent Reviewer
Disagree
This is not the same as a project database or dataportal or a searchable data source.

PWYF Final Assessment
Document
No project database or data portal found.

Donor Comments

Planning

Financial

4. Organisation Strategy

5. Annual Report

6. Allocation Policy

7. Procurement Policy

8. Country Strategy

9. Total Budget

10. Disaggregated Budgets

11. Audit

Publication Status

Always

Format: Document

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Resolucija_MRS_eng.pdf http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf

Comments

There is a Resolution on International Development Cooperation of the Republic of Slovenia for the period until 2015 There is also an Outline Programme for 2013 to 2015

Click here for indicator definition
Click here to view history

4. Organisation strategy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Resolucija_MRS_eng.pdf http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf Expand...
There is a Resolution on International Development Cooperation of the Republic of Slovenia for the period until 2015 There is also Expand...an Outline Programme... for 2013 to 2015

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Resolucija_MRS_eng.pdf http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf Expand...
There is a Resolution on International Development Cooperation of the Republic of Slovenia for the period until 2015 There is also Expand...an Outline Programme for 2013 to 2015

Donor Comments

Publication Status

Always

Format: Document

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf

Comments

No data available.

Click here for indicator definition
Click here to view history

5. Annual report

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf

Donor Comments

Publication Status

Always

Format: Document

Source

http://www.mzz.gov.si/en/foreign_policy/foreign_policy/international_development_cooperation_and_humanitarian_assistance/international_development_cooperation_of_slovenia/ http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Resolucija_MRS_eng.pdf

Comments

Statement on website gives geographical and policy priorities and Resolution on International Development Cooperation of the Republic of Slovenia until 2015. Scored 'always published', consistent with what has been accepted for other donors for this indicator.

Click here for indicator definition
Click here to view history

6. Allocation policy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.mzz.gov.si/en/foreign_policy/foreign_policy/international_development_cooperation_and_humanitarian_assistance/international_development_cooperation_of_slovenia/ http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Resolucija_MRS_eng.pdf Expand...
Statement on website gives geographical and policy priorities and Resolution on International Development Cooperation of the Republic of Slovenia until 2015

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree
Broad geographical and thematic allocation policies are available; however there are no open, understandable and transparent decision making process/allocation policy for Expand...allocation of funds between different implementing institutions.

PWYF Final Assessment
Always
Document
http://www.mzz.gov.si/en/foreign_policy/foreign_policy/international_development_cooperation_and_humanitarian_assistance/international_development_cooperation_of_slovenia/ http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Resolucija_MRS_eng.pdf Expand...
Statement on website gives geographical and policy priorities and Resolution on International Development Cooperation of the Republic of Slovenia until 2015. Expand...Scored 'always published', consistent with what has been accepted for other donors for this indicator.

Donor Comments

Publication Status

Always

Format: Document

Source

http://www.mf.gov.si/si/delovna_podrocja/sistem_javnega_narocanja/predpisi/

Comments

No data available.

Click here for indicator definition
Click here to view history

7. Procurement policy

Stage

Status

Format

Source

Comments

Researcher
Always
Document
http://www.mf.gov.si/si/delovna_podrocja/sistem_javnega_narocanja/predpisi/

Donor Review
Always
Document

PWYF Review
Always
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Always
Document
http://www.mf.gov.si/si/delovna_podrocja/sistem_javnega_narocanja/predpisi/

Donor Comments

Publication Status

Sometimes

Format: Document

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Podpisan_program_sodelovanja_2011-2012.pdf

Comments

The MoU is also the Country strategy. Programme of International Development Cooperation between the Republic of Slovenia and Montenegro for 2011 and 2012. But the programme remained in force only until 31 December 2012 and nothing more recent is available.

Click here for indicator definition
Click here to view history

8. Country strategy

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Podpisan_program_sodelovanja_2011-2012.pdf
The MoU is also the Country strategy. Programme of International Development Cooperation between the Republic of Slovenia and Montenegro for 2011 Expand...and 2012. But the programme remained in force only until 31 December 2012 and nothing more recent is available.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Podpisan_program_sodelovanja_2011-2012.pdf
The MoU is also the Country strategy. Programme of International Development Cooperation between the Republic of Slovenia and Montenegro for 2011 Expand...and 2012. But the programme remained in force only until 31 December 2012 and nothing more recent is available.

Donor Comments

Publication Status
Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf

Comments

The Outline Programme for 2013-15 gives forward information on Slovenia's Country Programmable Aid for 3 years.

Click here for indicator definition
Click here to view history

9. Total budget

Stage

Status

Format

Source

Comments

Researcher
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf
The Outline Programme ... for 2013 to 2015. This breaks down the overall budget by country with summaries of the projected Expand...budget for activities in country.

Donor Review
Pdf
The Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf gives forward information on Slovenia's Country Programmable Aid for 3 years, with the intention to Expand...switch over to a rolling 4 year programme after 2015.

PWYF Review
Pdf
Budgets run up to 2015. Hence scored '2 years ahead.'

Independent Reviewer
Disagree

PWYF Final Assessment
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf
The Outline Programme for 2013-15 gives forward information on Slovenia's Country Programmable Aid for 3 years.

Donor Comments

Publication Status
Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf

Comments

The Outline Programme for 2013-15 gives forward information on Slovenia's Country Programmable Aid for 3 years.

Click here for indicator definition
Click here to view history

10. Disaggregated budgets

Stage

Status

Format

Source

Comments

Researcher
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf
The Outline Programme ... for 2013 to 2015. Includes indicative overview of planned ODA spend by country (Table 3), broken down Expand...by year. It also sets out a brief breakdown of what the budget in country will be spent on. For the largest recipient, Montenegro, a summary is provided on page 8 of PDF.

Donor Review
Pdf
The Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf gives forward information on Slovenia's Country Programmable Aid for 3 years, with the intention to Expand...switch over to a rolling 4 year programme after 2015.

PWYF Review
Pdf
Disaggregated budget runs up to 2016. Hence scored '2 years ahead.'

Independent Reviewer
Disagree

PWYF Final Assessment
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf
The Outline Programme for 2013-15 gives forward information on Slovenia's Country Programmable Aid for 3 years.

Donor Comments

Publication Status

Sometimes

Format: Document

Source

https://www.google.co.uk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=9&cad=rja&ved=0CGsQFjAI&url=http%3A%2F%2Fwww.rs-rs.si%2Frsrs%2Frsrseng.nsf%2FI%2FK310CA12462DE9DDCC12579090031CFD9%2F%24file%2FMRP_RS_SP05-09_summary.doc&ei=RAyvUZ7RIMqu0QWmm4GIBw&usg=AFQjCNGUOTUFtTH0Ha-M8zCK4ou7g2TI2Q&sig2=w8svctIlyANS041dW1b8cQ&bvm=bv.47380653,d.d2k

Comments

Audit abstract from 2011 found but nothing more recent is available. Court of Audit's Annual Report is also from 2011.

Click here for indicator definition
Click here to view history

11. Audit

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
https://www.google.co.uk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=9&cad=rja&ved=0CGsQFjAI&url=http%3A%2F%2Fwww.rs-rs.si%2Frsrs%2Frsrseng.nsf%2FI%2FK310CA12462DE9DDCC12579090031CFD9%2F%24file%2FMRP_RS_SP05-09_summary.doc&ei=RAyvUZ7RIMqu0QWmm4GIBw&usg=AFQjCNGUOTUFtTH0Ha-M8zCK4ou7g2TI2Q&sig2=w8svctIlyANS041dW1b8cQ&bvm=bv.47380653,d.d2k Expand...
Audit abstract from 2011 found But nothing more recently. Court of Audit also has an Annual Report only from 2011.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Document
https://www.google.co.uk/url?sa=t&rct=j&q=&esrc=s&source=web&cd=9&cad=rja&ved=0CGsQFjAI&url=http%3A%2F%2Fwww.rs-rs.si%2Frsrs%2Frsrseng.nsf%2FI%2FK310CA12462DE9DDCC12579090031CFD9%2F%24file%2FMRP_RS_SP05-09_summary.doc&ei=RAyvUZ7RIMqu0QWmm4GIBw&usg=AFQjCNGUOTUFtTH0Ha-M8zCK4ou7g2TI2Q&sig2=w8svctIlyANS041dW1b8cQ&bvm=bv.47380653,d.d2k Expand...
Audit abstract from 2011 found but nothing more recent is available. Court of Audit's Annual Report is also from 2011.

Donor Comments

Basic

Classifications

Financial

Performance

12. Implementer

13. Unique ID

14. Title

15. Description

16. Planned Dates

17. Actual Dates

18. Current Status

19. Contact Details

20. Collaboration Type

21. Flow Type

22. Aid Type

23. Finance Type

24. Sector

25. Sub-national Location

26. Tied Aid Status

33. Overall Cost

34. Planned Expenditure

35. Actual Expenditure

36. Budget Identifier

37. Results

38. Impact Appraisals

39. Conditions

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.

Comments

Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Click here for indicator definition
Click here to view history

12. Implementer

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf Does sometimes specify the implementing agency for an activity. Expand...

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

13. Unique ID

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
This information could not be found

Donor Review
Not published
Not published

PWYF Review
Not published
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/

Comments

Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Click here for indicator definition
Click here to view history

14. Title

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
The activities discussed in the Annual Report and Outline Programme do not have titles.

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.

Comments

Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Click here for indicator definition
Click here to view history

15. Description

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf And the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf give descriptions of activities. It is not likely that these provide Expand...a comprehensive source on activities.

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.

Comments

Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Click here for indicator definition
Click here to view history

16. Planned dates

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
No evidence of planned dates on activities discussed in Annual Report or Outline Programme.

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

Only one set of dates is provided in project documents. These are assumed to be planned dates.

Click here for indicator definition
Click here to view history

17. Actual dates

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
This information could not be found

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Not published
Not published
Only one set of dates is provided in project documents. These are assumed to be planned dates.

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
Only one set of dates is provided in project documents. These are assumed to be planned dates.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.

Comments

Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Click here for indicator definition
Click here to view history

18. Current Status

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
Although various activities are outlined (in summary) in annual reports and outline plans, it is not possible to determine the status Expand...of these activities.

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

19. Contact details

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
This information could not be found

Donor Review
Not published
Not published

PWYF Review
Not published
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

No data available.

Comments

There is no comprehensive or standardised list of projects or activities, and therefore no identification of collaboration type per activity. The Act states that there are various types of collaboration, including TA, projects, donations to institutions, etc., and the MFA states that various organisations implement activities, so it is not possible to assume that all projects have the same collaboration type.

Click here for indicator definition
Click here to view history

20. Collaboration Type

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf And the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf give collaboration type for some activities. It is not likely that Expand...these provide a comprehensive source on activities.
There is no comprehensive or standardised list of projects or activities, and therefore no identification of collaboration type per activity. Expand...The Act states that there are various types of collaboration, including TA, projects, donations to institutions, etc., and the MFA states that various organisations implement activities, so it is not possible to assume that all projects have the same collaboration type.

Donor Review
Sometimes
Pdf

PWYF Review
Sometimes
Pdf

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
There is no comprehensive or standardised list of projects or activities, and therefore no identification of collaboration type per activity. The Expand...Act states that there are various types of collaboration, including TA, projects, donations to institutions, etc., and the MFA states that various organisations implement activities, so it is not possible to assume that all projects have the same collaboration type.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf

Comments

No obvious discussion of the flow type on website, but the Annual Report specifies that it is showing ODA projects.

Click here for indicator definition
Click here to view history

21. Flow Type

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf Provides breakdown of ODA only and specifies this. Expand...
No obvious discussion of the flow type on website, but the Annual Report specifies that it is showing ODA.

Donor Review
Sometimes
Pdf

PWYF Review
Sometimes
Pdf

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf
No obvious discussion of the flow type on website, but the Annual Report specifies that it is showing ODA projects.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf

Comments

The annual report and the outline programme for 2013-2015 lists aid type for some activities.

Click here for indicator definition
Click here to view history

22. Aid Type

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf And the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf give aid type for some activities. It is not likely that Expand...these provide a comprehensive source on activities.
There is no comprehensive or standardised list of projects or activities, and therefore no identification of aid type per activity. Expand...The Act states that there are various types of collaboration, including TA, projects, donations to institutions, etc.

Donor Review
Sometimes
Pdf

PWYF Review
Sometimes
Pdf

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf
The annual report and the outline programme for 2013-2015 lists aid type for some activities.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf

Comments

The annual report and the outline programme for 2013-2015 lists finance type for some activities.

Click here for indicator definition
Click here to view history

23. Finance Type

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf And the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf give finance type for some activities. It is not likely that Expand...these provide a comprehensive source on activities.

Donor Review
Sometimes
Not published

PWYF Review
Sometimes
Pdf

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf Expand...
The annual report and the outline programme for 2013-2015 lists finance type for some activities.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.

Comments

There is no standardised list or database of activities, so much of this information is not available. Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Click here for indicator definition
Click here to view history

24. Sector

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf And the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf give sectors for some activities. It is not likely that these Expand...provide a comprehensive source on activities.
There is no standardised list or database of activities, so much of this information is not available.

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/.
There is no standardised list or database of activities, so much of this information is not available. Since the CMSR implemented Expand...only a part of Slovenia's ODA, this has been scored as 'sometimes published.'

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

25. Sub-national location

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
This information could not be found

Donor Review
Not published
Not published

PWYF Review
Not published
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

26. Tied Aid Status

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
This information could not be found

Donor Review
Not published
Not published

PWYF Review
Not published
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found.

Donor Comments

Publication Status

Sometimes

Format: Document

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Podpisan_program_sodelovanja_2011-2012.pdf

Comments

Programme of International Development Cooperation between the Republic of Slovenia and Montenegro for 2011 and 2012 is available but the programme remained in force only until 31 December 2012 and nothing more recent is available.

Click here for indicator definition
Click here to view history

27. MoU

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Podpisan_program_sodelovanja_2011-2012.pdf
Programme of International Development Cooperation between the Republic of Slovenia and Montenegro for 2011 and 2012 But the programme remained in Expand...force only until 31 December 2012 and nothing more recent is available.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Podpisan_program_sodelovanja_2011-2012.pdf
Programme of International Development Cooperation between the Republic of Slovenia and Montenegro for 2011 and 2012 is available but the programme Expand...remained in force only until 31 December 2012 and nothing more recent is available.

Donor Comments

Publication Status

Sometimes

Format: Document

Source

http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Vmesna_ocena.pdf

Comments

There was a review of Slovenia's overall development effectiveness. "INTERIM ASSESSMENT OF THE EFFECTIVENESS OF IMPLEMENTATION OF RESOLUTION FOR INTERNATIONAL DEVELOPMENT Cooperation for the period up to 2015"

Click here for indicator definition
Click here to view history

28. Evaluations

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
There was a review of Slovenia's overall development effectiveness. "INTERIM ASSESSMENT OF THE EFFECTIVENESS OF IMPLEMENTATION OF RESOLUTION FOR INTERNATIONAL DEVELOPMENT Expand...Cooperation for the period up to 2015" (published in late 2011 or early 2012?) http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Vmesna_ocena.pdf No other evaluations are apparent.

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Document
http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Vmesna_ocena.pdf
There was a review of Slovenia's overall development effectiveness. "INTERIM ASSESSMENT OF THE EFFECTIVENESS OF IMPLEMENTATION OF RESOLUTION FOR INTERNATIONAL DEVELOPMENT Expand...Cooperation for the period up to 2015"

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

29. Objectives

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
N/A
This information could not be found

Donor Review
Not published
Document

PWYF Review
Not published
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Document
This information could not be found.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

30. Budget Docs

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
N/A
This information could not be found

Donor Review
Not published
Document

PWYF Review
Not published
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Document
This information could not be found.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

31. Contracts

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
N/A
This information could not be found

Donor Review
Not published
Document

PWYF Review
Not published
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Document
This information could not be found.

Donor Comments

Publication Status

Always

Format: Document

Source

http://www.mzz.gov.si/si/o_ministrstvu/javne_objave/javni_razpisi/novica/article/141/30107/c6e93cbdec/

Comments

As indicated by the reviewer's comments, the tendering process needs improvements. However based on the comments, contracts that are tendered are published. Hence scored 'always published' consistent with what has been accepted for other donors for this indicator.

Click here for indicator definition
Click here to view history

32. Tenders

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.mzz.gov.si/si/o_ministrstvu/javne_objave/javni_razpisi/novica/article/141/30107/c6e93cbdec/

Donor Review
Always
Document
All MFA tenders are always published at http://www.mzz.gov.si/si/o_ministrstvu/javne_objave/javni_razpisi/novica/article/141/30107/c6e93cbdec/. The majority of MFA funds, however, are awarded to implements via direct contracts. Expand...The implementers tender those funds according to recipient's (i.e. the CMSR) and Slovenia's public procurement and public finance legislation.

PWYF Review
Always
Document
http://www.mzz.gov.si/si/o_ministrstvu/javne_objave/javni_razpisi/novica/article/141/30107/c6e93cbdec/
Calls for proposals from NGOs accepted as equivalent documents to tenders.

Independent Reviewer
Disagree
Only Calls for proposals from NGOs, which constitute less than 1,5 % of ODA, are publicly available in Slovenian language via Expand...website. The rest of the ODA is not allocated through open tendering procedures. PWYF: "ALWAYS" - comment: By our data, only tender for NGOs is published. CMSR selects projects using "Guidelines for project preparation" (published on their wesite), but subcontractors of those projects should be selected by local procurement rules, which we were not able to trace on websites.

PWYF Final Assessment
Always
Document
http://www.mzz.gov.si/si/o_ministrstvu/javne_objave/javni_razpisi/novica/article/141/30107/c6e93cbdec/
As indicated by the reviewer's comments, the tendering process needs improvements. However based on the comments, contracts that are tendered are Expand...published. Hence scored 'always published' consistent with what has been accepted for other donors for this indicator.

Donor Comments

Publication Status

Sometimes

Format: Pdf

Source

http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/

Comments

Since the CMSR implemented only a part of Slovenia's ODA, this has been scored sometimes published.

Click here for indicator definition
Click here to view history

33. Overall cost

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Pdf
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf And the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf give indicative costs of activities. It is not likely that these Expand...provide a comprehensive source on activities.

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Sometimes
Pdf
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored sometimes published.

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Pdf
http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/
Since the CMSR implemented only a part of Slovenia's ODA, this has been scored sometimes published.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found. Planned expenditure needs to be published on a per transaction, per activity basis.

Click here for indicator definition
Click here to view history

34. Planned expenditure

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
This information could not be found

Donor Review
Sometimes
Pdf
Consider the Outline Programme for 2013-15 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/OP13-15.pdf, which entails country allocations for Country Programmable Aid activities. Expand...

PWYF Review
Not published
Not published
Planned expenditure needs to be published on a per transaction, per activity basis.

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found. Planned expenditure needs to be published on a per transaction, per activity basis.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found. Actual expenditure needs to be published on a per activity basis.

Click here for indicator definition
Click here to view history

35. Actual expenditure

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
Annual Report 2012 http://www.mzz.gov.si/fileadmin/pageuploads/Zunanja_politika/RA/Porocilo_2012.pdf Does sometimes specify the actual expenditure for an activity, but not on a per-transaction basis. Expand...

Donor Review
Sometimes
Pdf
Information on the bulk of Slovenia's Country Programmable Aid is available in pdf by the CMSR http://www.cmsr.si/Dejavnosti/Mednarodno_razvojno_sodelovanje/Projekti/. Expand...

PWYF Review
Not published
Not published
Actual expenditure needs to be published on a per activity basis

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found. Actual expenditure needs to be published on a per activity basis.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

36. Budget Identifier

Stage

Status

Format

Source

Comments

Researcher
Not published
N/A
This information could not be found

Donor Review
Not published

PWYF Review
Not published
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

37. Results

Stage

Status

Format

Source

Comments

Researcher
Not published
Not published
N/A
There is no obvious discussion of results even in the Annual Report.

Donor Review
Not published
Not published

PWYF Review
Not published
Not published

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Not published
This information could not be found.

Donor Comments

Publication Status

Not Published

Source

No data available.

Comments

This information could not be found.

Click here for indicator definition
Click here to view history

38. Impact Appraisals

Stage

Status

Format

Source

Comments

Researcher
Not published
Document
N/A
This information could not be found

Donor Review
Not published
Document

PWYF Review
Not published
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Not published
Document
This information could not be found.

Donor Comments

Publication Status

Sometimes

Format: Document

Source

http://www.mzz.gov.si/si/zunanja_politika_in_mednarodno_pravo/zunanja_politika/mednarodno_razvojno_sodelovanje_in_humanitarna_pomoc/izvajanje/

Comments

The MFA website provides links to manuals for financial reporting, but no information on broader conditions on aid.

Click here for indicator definition
Click here to view history

39. Conditions

Stage

Status

Format

Source

Comments

Researcher
Sometimes
Document
http://www.mzz.gov.si/si/zunanja_politika_in_mednarodno_pravo/zunanja_politika/mednarodno_razvojno_sodelovanje_in_humanitarna_pomoc/izvajanje/ The MFA website provides links to manuals for financial reporting, but no information on broader conditions on aid. Expand...

Donor Review
Sometimes
Document

PWYF Review
Sometimes
Document

Independent Reviewer
Disagree

PWYF Final Assessment
Sometimes
Document
http://www.mzz.gov.si/si/zunanja_politika_in_mednarodno_pravo/zunanja_politika/mednarodno_razvojno_sodelovanje_in_humanitarna_pomoc/izvajanje/
The MFA website provides links to manuals for financial reporting, but no information on broader conditions on aid.

Donor Comments

>